On the way from Osaka to Tokyo. Stopped by to visit a retrofit job.
Remove the carpet tile first. The carpet tile will be installed again on top of the Netfloor.
Old floor ducts are not sufficient for cable routing.
Continuous remove of carpet tile
Clean the floor before apply Netfloor
After clean the floor, start applying Sound Attenuation Blanket
Apply Sound Attenuation Blanket
Move the Netfloor in System: ECO series CA-400R
Start installing UniPanel
After finishing UniPanel, reinstall the carpet tile
Professional workmanship in Japan is an essential: Job sites are always clean and neat. Installation is very fast. Regret I only stayed for a while. So, did not shoot the finish scene.