Upgrading at government office

  (OFTA) in Hong Kong

 


 

Case Study ----------------------------------- February, 2002

System: Camass CA1000-60 (60 mm height)

Retrofit to substitute the old "in-floor duct"

Quantity: Total 2,000 sq. meter continuous job

 


 

Camass CA1000-60 (60 mm height)
To install on top of old In-Floor Duct.

 

 

 

 

 

Capacity of old In-Floor cable ducts are not enough any more. Netfloor Camass is an ideal cable management floor for modernization in old office building:

  1. Light Weight: Half weight to traditional access floor. Much less burden to old buildings
  2. Easy and Quick installation
  3. Low-Profile: The only access floor suitable for installation at 5 to 100 mm height
  4. Full steel, non-combustible

 

Quick and quiet renovation and upgrading office building

 

 

 

 

 

-- Continuous interlocking installation of Base Connector + UniPanel

 

 

 

 

Flank cap to install after finishing of every 3 to 4 rows. Steel trench caps can be easily lifting by hand for cable routing without using of special tools such as panel-lifter.

 


 