|
Upgrading at government office |
(OFTA) in Hong Kong |
|
|
|
Case Study ----------------------------------- February, 2002 |
System: Camass CA1000-60 (60 mm height) |
Retrofit to substitute the old "in-floor
duct" |
Quantity: Total 2,000 sq. meter continuous job |
|
|
|
|
Camass CA1000-60 (60 mm height) To install on top of old In-Floor Duct. |

|

|

|
|
|
|

|
|
|
Capacity of old In-Floor cable
ducts are not enough any more. Netfloor Camass is an
ideal cable management floor for modernization in old
office building: |
Light Weight: Half weight
to traditional access floor. Much less burden to
old buildings
Easy and Quick installation
Low-Profile: The only
access floor suitable for installation at 5 to 100
mm height
Full steel, non-combustible
|
|
Quick and quiet renovation and upgrading
office building |

|

|

|
|
|
|

|
 |
|
-- Continuous interlocking
installation of Base Connector + UniPanel |
|

|

|

|
|
|
|

|

|

|
Flank cap to install after
finishing of every 3 to 4 rows. Steel trench caps can
be easily lifting by hand for cable routing without
using of special tools such as panel-lifter. |
|
|
|
|
BACK |
|
Copyright
Netfloor, Inc. All Rights Reserved. |
|