南港軟體園區專案
A new industrial park in Taipei vicinity
Unloading of UniPanel
Sub-floor shall be clean, smooth before installation
Connecting UniPanel by Base Connector
Install Central Cap and Flank Cap Row by row and area by area
Pillar: same procedure as perimeter installation
Gang saw for perimeter cutting
Laser using in installation
Dry wall installing above Camass
Dry wall installed before Camass
Meet circle wall